Secondary school building Chliriet, Oberglatt

Client Sekundarschulgemeinde Rümlang-Oberglatt
Architects BS + EMI Architektenpartner, Zürich
Planning 2019-2020
Execution 2020-2022
Construction cost 22 Mio SFR
Services Structure and excavation for solid construction:
competition
design phase
tender documentation phase
execution phase
Photos Roland Bernath
Engineering partner Pirmin Jung Schweiz AG, Sargans
Topics EducationTimber constructionConcrete constructionFair faced concrete

The Chliriet school complex is located between the municipalities of Rümlang and Oberglatt in a former wetland area. The long, narrow building consists of a basement, a first floor and an upper floor. The cantilevered flying roof gives the architecture its own expression. The basement and ceiling are made of reinforced concrete. The building structure above ground was constructed as a timber frame. The thirteen axes are flush with the classrooms. The access and group rooms face the schoolyard. The clusters with anterooms, classrooms and group rooms on the upper floor are accessed via a series of stairs from the lobby on the first floor.