The Barilga Expo construction trade fair will take place in the Mongolian capital of Ulaanbaatar from April 13 to 16, 2012. The swissmade mongolia team, which also includes Dr. Lüchinger+Meyer’s construction and facade engineers, will be presenting itself once again as part of this exhibition. After the Circus Tower in 2011, another high-rise project is now being presented.
The BT Tower, a zero emission building, was developed by the interdisciplinary swissmade mongolia team. The extreme climatic conditions – temperature fluctuations from -45°C to +45°C had to be taken into account – as well as the high seismic effects, which far exceed Central European standards, posed the greatest challenges for the technical planning.
Dr. Lüchinger+Meyer Bauingenieure AG are responsible for the Façade Engineering and the development of the building structure.